| Team A | Team B | Team C | Team D | ||||
|---|---|---|---|---|---|---|---|
| Siddhesh Mhaparle (Mechanical Engineer) | DVSR Nikhil (Mechanical MT) | Sumeet Dave (Process Engineer) | Pravin Gosavi (Office Boy Pantry) | ||||
| Afjal Khan (Fabricator) | Pramod Kumar (Fabricator) | Bhanu Jaiswal (Fabricator) | Gajanan Ambhore (Housekeeping) | ||||
| Santosh Yadav (Welder) | Dharen Sharma (Welder) | Parshuram Patil (Welder) | Sadiq Ansari (Helper) | ||||
| Sahdev Ram (Grinder) | Rakesh Chauhan (Grinder) | Jayprakash Yadav (Grinder) | Chhotu Khan (Helper) | ||||
| Activity: 1) C-305: Structure Fabrication by 08/10/25 & Equipment fabrication 2) Porta Cobin 1 ing ress by today 3) Porta Cabin 2 Shifting by today 4) Material Shifting ky today |
Activity: 1) Boiler Insulation will done by 05/10/05 2) Burner bott welding to be clone by today |
Activity: 1) 7105: Sleeper Line Fobricati on to be by 04/10/25 2) Interconnected spools Labelling to be done by 04/10/25 3) Painting of Lines 04/10/25 Pickling 4) SK-Of Spool to be dore Hoday |
|||||